12 kV line work - Fall 2010 © ZionSolutions LLC. All rights reserved. (all photos) 
02-Unit 2 DeTensioning - Fall 2010

03-Unit 2 Tension Removal - Nov 2010

04-Scaffold erection for Turbine Building Asbestos abatement Feb 2011

05-Asbestos enclosures - asbestos abatement program - Turbine Building

06-Asbestos Abatement completed - Unit 2 Turbine Deck - March 2011
07-Unit 2 Containment Hatch Removal March 2011
.jpg)
08-Initial cutting of the Containment Opening in Unit 2 - April 2011

09-Reactor Cavity Preparations March 2011

10-Unit 2 Hatch Platform Segmentation April 2011
11-Unit 1 containment opening work - May 2011

12-Unit 2 Containment opening May 2011
13-Unit 1 Main Power Transformer (MPT) removal work June 2011

14-Installed Containment Opening Doors on Unit 2 - June 2011
.jpg)
15-Unit 2 Containment opening steel liner removal June 2011

16-Containment duct work removal June 2011

17-Unit 2 Heavy Lift Rail System (HRLS) installation July 2011
_installation_July_2011.jpg)
18-Unit 2 sand box cover removal August 2011

19-1st Greater Than Class C (GTCC) canister arrival - August 2011
_canister_arrival_-_August_2011.jpg)
20-Transfer of GTCC canister inside Turbine Building - August 2011

21-GTCC canister placed on Turbine Deck for temporary storage - August 2011
.jpg)
22-Placement of transformer for future power needs after main power source is de-energized as part of decommissioning - Sept 2011

23-Removing reactor coolant system piping interferences in Unit 2 - Sept 2011

24 - building on-site rail - February 2012
.jpg)
25 - Zion Station - on-site rail construction - February 2012

26 - Zion Station - placing rail ties
.jpg)